When overhead cranes reach their limits
At our customer Präwema Antriebstechnik GmbH, a 28-tonne milling machine was ready for shipment to Italy. However, the machine exceeded the lifting capacity of the factory's overhead cranes by several tonnes.
Speedlog provided its complete solution for internal heavy machinery transport: specialist personnel with heavy-duty rollers, a mobile crane, a covered low-loader and a curtain-side trailer for accessories.
“With careful planning and close coordination, even extremely heavy machines can be moved safely out of restricted production areas.”
– Grigo SImsek
Precision loading with a 100-tonne mobile crane
Established procedures and close cooperation between everyone involved and the Präwema employees ensured smooth operations.
The milling machine was positioned on heavy-duty rollers inside the factory and moved outside with forklift assistance. A 100-tonne mobile crane then carefully lifted it onto the covered low-loader.
With loading complete, the journey to Italy could begin. Thorough preparation made this challenging operation manageable.